Cold Plate Gas Leak Testing Cell

BACK
Automated Gas Leak Testing cell for Cold Plate manufacturing

Challenger

Cold plates are key components in liquid cooling systems, ensuring efficient heat dissipation and reliable system performance. To guarantee the quality of every component before assembly, the customer required a fully automated End-of-Line (EOL) testing solution capable of validating each part with maximum reliability.

The main challenge was to integrate multiple quality-control processes into a single automated cell. The solution had to perform structural integrity verification, high-sensitivity helium leak testing, dimensional and vision inspection, laser marking and complete traceability, while maintaining high production throughput and consistent testing conditions.

Gaindu developed a fully integrated EOL testing cell that automates the complete inspection process. Robotic handling transfers each Cold Plate through every testing station, while all process data is recorded and linked to a unique 2D Data Matrix code, ensuring full traceability and reliable quality control for every part.

Interested in knowing more how we can help you?

CONTACT US